SKENARIO ROADMAP IMPLEMENTASI PENGEMBANGAN PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) UNTUK MENDUKUNG TARGET ENERGI TERBARUKAN PROVINSI NUSA TENGGARA TIMUR

Authors

  • Candra Arie Nugrahanto Akademi Komunitas Olat Maras
  • Pipit Puspitasari Akademi Komunitas Olat Maras
  • Rizqi Renafasih Alinra Akademi Komunitas Olat Maras
  • Wahyu Hanaldi Akademi Komunitas Olat Maras

DOI:

https://doi.org/10.59003/nhj.v6i2.2265

Keywords:

Solar Energy, Solar Power Plant, East Nusa Tenggara, Renewable Energy

Abstract

East Nusa Tenggara Province has substantial solar energy potential, with an average annual solar irradiance of approximately 413 W/m² and 8 Peak Sun Hours (PSH) per day (NASA). This study proposes a comprehensive master plan for Solar Power Plant (SPP) development aligned with Indonesia's National Energy Policy (KEN), National Energy General Plan (RUEN), and PLN's Electricity Supply Business Plan (RUPTL). The methodology includes solar resource assessment, electricity demand analysis, technical evaluation of photovoltaic systems, techno-economic analysis, and the development of an implementation roadmap through 2048. The results indicate that phased SPP deployment effectively balances capital investment (CAPEX) and long-term revenue generation. Although the initial stage requires significant investment, increasing renewable electricity production during operation enhances project profitability and supports positive cash flow over its lifetime. The proposed master plan demonstrates favorable technical and economic feasibility while contributing to energy security, greenhouse gas emission reduction, and the transformation of East Nusa Tenggara into a strategic renewable energy hub in Eastern Indonesia.

Downloads

Download data is not yet available.

References

Badan Pusat Statistik. (2025). Provinsi Nusa Tenggara Timur dalam angka 2025. Badan Pusat Statistik.

Boyle, G. (2019). Renewable energy: Power for a sustainable future (5th ed.). Oxford University Press.Duffie, J. A., & Beckman, W. A. (2013). Solar engineering of thermal processes (4th ed.). John Wiley & Sons.

Green, M. A. (2022). Solar cells: Operating principles, technology, and system applications. UNSW Press.

Hikmat, M., Hati, D. P., Pratamaningsih, M. M., & Sukarman. (2022). Kajian lahan kering berproduktivitas tinggi di Nusa Tenggara untuk pengembangan pertanian. Jurnal Sumberdaya Lahan, 16(2), 119–133.

International Electrotechnical Commission. (2021). IEC 61724-1: Photovoltaic system performance monitoring. IEC.

International Energy Agency. (2024). World energy outlook 2024. IEA.

International Finance Corporation. (2019). Utility-scale solar photovoltaic power plants: A project developer's guide. World Bank Group.

International Renewable Energy Agency. (2023). Renewable energy statistics 2023. IRENA.

International Renewable Energy Agency. (2024). Renewable power generation costs in 2023. IRENA.

Kalogirou, S. A. (2020). Solar energy engineering: Processes and systems (3rd ed.). Academic Press.

Kementerian Energi dan Sumber Daya Mineral. (2024). Handbook of energy and economic statistics of Indonesia 2024. Kementerian Energi dan Sumber Daya Mineral.

Kementerian Energi dan Sumber Daya Mineral. (2024). Peraturan Menteri Energi dan Sumber Daya Mineral Nomor 2 Tahun 2024 tentang Pembangkit Listrik Tenaga Surya Atap yang Terhubung pada Jaringan Tenaga Listrik Pemegang IUPTLU untuk Kepentingan Umum. Kementerian Energi dan Sumber Daya Mineral.

Kementerian Energi dan Sumber Daya Mineral. (2025). Rencana usaha penyediaan tenaga listrik (RUPTL) PT PLN (Persero) Tahun 2025–2034. Kementerian Energi dan Sumber Daya Mineral.

Masters, G. M. (2013). Renewable and efficient electric power systems (2nd ed.). John Wiley & Sons.

National Renewable Energy Laboratory. (2023). Best practices in photovoltaic system design and operation. NREL.

Nelson, J. (2003). The physics of solar cells. Imperial College Press.

NASA POWER Project. (2026). Prediction of Worldwide Energy Resources (POWER) Data Access Viewer. https://power.larc.nasa.gov/

PT PLN (Persero). (2025). Rencana usaha penyediaan tenaga listrik (RUPTL) 2025–2034. PT PLN (Persero).

Republik Indonesia. (2007). Undang-Undang Republik Indonesia Nomor 30 Tahun 2007 tentang Energi. Pemerintah Republik Indonesia.

Republik Indonesia. (2014). Peraturan Pemerintah Republik Indonesia Nomor 79 Tahun 2014 tentang Kebijakan Energi Nasional. Pemerintah Republik Indonesia.Republik Indonesia. (2017).

Downloads

Published

2026-07-30

How to Cite

Candra Arie Nugrahanto, Pipit Puspitasari, Rizqi Renafasih Alinra, & Wahyu Hanaldi. (2026). SKENARIO ROADMAP IMPLEMENTASI PENGEMBANGAN PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) UNTUK MENDUKUNG TARGET ENERGI TERBARUKAN PROVINSI NUSA TENGGARA TIMUR. Nusantara Hasana Journal, 6(2), 355–368. https://doi.org/10.59003/nhj.v6i2.2265